SAN MATEO COUNTY Project Project Fiscal Total Cost ID RTE Length Location/Description Year $'s x 1000 ------ ------ ----- ------------------------------- -------- ---------- 417700 84 1.3 Menlo Park-Willow Road to 1996/97 $816 Dumbarton Bridge-concrete median barrier 413292 1 4.9 Near Half Moon Bay-Tuntias 1993/94 $2,300 Creek Road to Miramontes Point Road-rehabilitate roadway 410856 1 1.9 Near Pacifica-north of Montara 1994/95 $685 to San Pedro Avenue asphalt overlay 413503 35 1.1 Near San Bruno-Route 280 to 1996/97 $1,570 Sneath Lane-rehabilitate roadway 413538 82 3.6 Redwood City and San 1996/97 $6,574 Mateo-Edgewood Road to 43rd Avenue-rehabilitate roadway 413161 82 3.5 Near San Mateo-Santa Inez 1995/96 $4,019 Avenue to Murchison Drive-rehabilitate roadway 417930 82 1.2 Daly City-San Pedro Avenue to 1996/97 $1,809 Hillsdale Boulevard-rehabilitate roadway 416970 84 1.6 Near Woodside-Union Creek 1995/96 $831 Bridge to Route 280-rehabilitate roadway 414700 280 Daly City-San Pedro Road to 1994/95 $505 Washington Street-seismic retrofit 417052 1 48.6 Countywide-various locations on 1994/95 $735 Routes 1, 35, 84, 92, 101, 109, 114 and 280 wheelchair ramps 416270 1 4.2 El Granada and Montara-Coronado 1995/96 $1,134 Avenue, 10th Street and Main Street install signal and modify intersections; add left turn lanes 417051 82 25.1 Countywide-various locations on 1994/95 $785 Route 82-wheelchair ramps 416480 84 0.4 Near Redwood City-various 1997/98 $268 locations on Route 84-interconnect signals 410023 92 0.6 San Mateo-Alameda De Las Pulgas 1993/94 $444 to South Delaware Street-upgrade irrigation 413578 101 0.6 Burlingame-Broadway to Millbrae 1995/96 $2,260 Avenue-truck scale southbound side 413501 101 2.4 Burlingame-Millbrae Avenue to 1993/94 $376 San Francisco Airport-upgrade irrigation 420775 Half Moon Bay-near Miramontes 1993/94 $1,623 Road-reconstruct maintenance station 420799 South San Francisco-Airport 1993/94 $2,280 Boulevard-new maintenance station